Page 6 Visit the Premier Mounts website at www.mounts.com Installation Instructions
Installation of the power must be done by an
electrician.
Remove screws from around the desired electrical
knockouts (Figure 1) to detach their covers.
®
Remove the knockout covers from the top of the
GB-AVSTOR4 (Figure 2).
¯
Remove the knockouts.
1- and 2-gang electrical knockouts
inside the GB-AVSTOR4
Figure 1
Figure 2
Detach the knockout
cover after removing its
screws.
If you have opened a knockout and no longer want
to use it, re-attach its cover to prevent airow into
the ceiling.
Removing the Electrical Knockouts (optional)
GB-AVSTOR4
Determine the desired placement of the
GB-AVSTOR4.
®
Cut and remove half of the ceiling tile where the
ceiling box will be mounted.
Store the half-ceiling tile in a safe location in the
event that it needs to be reused.
Step 1
Ceiling Box Installation